Intumescent Paints for Fire Protection of Structural Steel Framed Buildings Independently Tested and Certified by Warrington Fire Research.
The Steelmaster Fire Protection Range is recommended on Structural Steel requiring 60 mins, 90 mins, 2 and 3 Hours Fire Protection. Designed to offer the Highest Fire Protection at the minimum Dry Film Thickness.
Advanced Waterbased Technology with Low VOCs meeting Green Building Standards.
Showing all 3 resultsSorted by popularity





